As you can see the deepest intersection in this series is
73.6 m.
The metal zone north of the property returned high grade grab and channel samples (3 grab samples assayed 5.35%, 1.29% and 0.68% copper with traces of gold and silver) and drill intersections up to 0.9% Cu over 13 ft (4m) at 53.0-68.0 feet. (16.15 to 21m)
The No. l Copper-Precious Metal Structure is delineated over a strike length of 3,500m (3.5 k) and varies in width from 18m in the west to 45m in the east. A historical 2.4m channel sample containing some massive sulphide assayed 6.78% copper
and 60 g/t silver.
The No. 2 Copper Structure consists of mainly quartz-carbonate veining hosted by sheared and chloritized siltstone and conglomerate. The zone measures at least 1,340m long (east-west).
The extension of the zone to the east has recently been confirmed by prospecting. The so-called Southeast Trench in this zone, gave (historical) 1.83% copper over a 1.2m channel of chalcopyrite-rich quartz veining.
Copyright © 2024 Big Red Mining Corp. - All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.